URUZ follows a phased deployment strategy. First measure. Then limit. Only then trust. Each phase advances only through formal go/no-go criteria.

Public progression gates include reconciliation mismatch rate, readiness uptime, critical incident count, and parity/drift checks during shadow phases.

Phase 01
Devnet
Q4 2024 – Present
Active
Progress85%
Private multi-node devnet
Private distributed devnet with continuous monitoring and operational hardening.
// Devnet
Automatic recovery and catch-up
Nodes automatically recover and converge after restart or partial desynchronization.
// Infrastructure
Runtime performance hardening
Critical-path concurrency and replay behavior were optimized for stable operation under load.
// Performance
Anchored bootstrap integrity
Bootstrap trust and state import integrity are enforced with multi-layer validation.
// Security
Adaptive telemetry pipeline
Adaptive network telemetry and anomaly detection are active in production-like operation.
// Security
Participation diversity hardening
Participation and checkpoint uniqueness safeguards are being finalized for testnet readiness.
// Security - in progress
Phased finality weighting
Finality influence ramps in stages to reduce abrupt adversarial leverage.
// Security - planned
Participation-quality gating
Windowed participation-quality gates are being tuned for robust reputation progression.
// Security - planned
Phase 02
Guarded Testnet
Target window: 2026 (gate-dependent)
Up Next
Public testnet launch
Permissionless network opening in controlled waves. Real transactions and finality behavior under testnet conditions.
// Testnet
Advanced diversity filters
Graph-diversity filters are planned to further reduce coordinated-influence patterns.
// Security
Consensus reputation activation
Consensus reputation transitions from observation to controlled influence with explicit rollout gates.
// SGI - Phase 1
Checkpoint consistency pilot
Checkpoint-linked consistency signals and upgraded snapshot integrity are planned for guarded rollout.
// Security
Early-phase admission safeguards
Initial participation controls are planned to reduce low-cost flood and Sybil-style onboarding abuse.
// Security
TypeScript SDK v0.1
Client library for building on URUZ. Wallet creation, transaction submission, finality status polling.
// SDK
DAG Explorer
Web-based explorer showing transaction status, finality states, score accumulation and network topology.
// Tools
Peer diversity enforcement
Network-layer diversity checks and eclipse-resilience procedures are included in guarded testnet scope.
// Security
Phase 03
Guarded Mainnet
Target window: 2026–2027 (gate-dependent)
Upcoming
Automated quarantine workflow
Automated quarantine logic is planned once consistency and attestation signals are operationally validated.
// Security
Adaptive parameters - full effect
Adaptive parameter controls move to full effect after staged validation and safety backtesting.
// Protocol
Attestation liveness monitoring
Attestation liveness and censorship-resilience monitoring are planned as mainnet safety prerequisites.
// Security
Smart contract layer
URUZ VM smart-contract execution layer with phased rollout and compatibility adapters where needed.
// Contracts
ZK state proof integration
Phased light-client proof path for stronger independent verification and reduced trust assumptions over time.
// ZK
Independent security audit
Full protocol and implementation audit by an independent security firm prior to full mainnet activation.
// Security
Phase 04
Mainnet
Target window: after guarded phases (gate-dependent)
Upcoming
Mainnet genesis
Live network launch with guarded activation, real transactions, and phased security controls under formal gates.
// Mainnet
Native token (URUZ)
Network token for transaction fees and node incentives. Distribution model announced only after guarded readiness gates are met.
// Token
Full SGI — Phase 2 activation
Full reputation-driven finality influence after phased validation and governance gates are complete.
// SGI — Phase 2
Cross-chain bridges
Cross-chain interoperability path with staged trust minimization, formal verification milestones, and independent security review.
// Interop